The Study Committee B2 covers design, construction and operation of overhead lines including the mechanical and electrical (in cooperation with SC C3 and SC C4) design of line components (conductors, ground wires, insulators, accessories, structures and their foundations), validation tests, the study of in service performance, the assessment of the state of line components and elements, the maintenance, the refurbishment as well as upgrading and uprating of overhead lines.